• / 1
  • 下载费用:10 金币  

合拢与体系转换工艺流程图.doc

关 键 词:
合拢 体系 转换 工艺 流程图
资源描述:
Workmanship flow chart for closing segment and system transformation Locking permanent bearing, removing temporary bearingSetting up heavy water tankWelding shape steel supportTensioning temporary priestess bondGrouting concrete of No.1Survey elevating of observing point after grouting concreteCuring and removing forms Tensioning and pouring Survey elevation after tensioningAdjust construction forms elevation of No.2 closing segmentNo.2 and No.1 closing segment construction in cyclesReject locking permanent bearing. Finishing turning of whole bridge systemHanged forms of No.1 closing segment, tying reinforcementSurvey elevation of observing point before grouting concreteSurvey elevation of observing point Before tensioning Setting up heavyWater tankTake away heavy water tank
展开阅读全文
1
  金牌文库所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。
0条评论

还可以输入200字符

暂无评论,赶快抢占沙发吧。

关于本文
本文标题:合拢与体系转换工艺流程图.doc
链接地址:http://www.gold-doc.com/p-11265.html
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服客服 - 联系我们
copyright@ 2014-2018 金牌文库网站版权所有
经营许可证编号:浙ICP备15046084号-3
收起
展开